Low price shotcrete concrete pump machine
The operation of the Low price shotcrete concrete pump machine should first supply the air, then the water, and then the material. After the spraying, the material should be stopped first, then the air should be stopped, and then the water should be stopped.
The operation of the Low price shotcrete concrete pump machine should first supply the air, then the water, and then the material. After the spraying, the material should be stopped first, then the air should be stopped, and then the water should be stopped. Blocked pipes should be cleared as soon as possible. When dealing with blocked pipes, it is strictly forbidden to stand in front of the nozzle to prevent the spray and water from hurting people. Always check whether the pipes and joints are firm and there is no possibility of breakdown. After spraying concrete, the time from the next blasting after spraying shall not be less than 4 hours.