Grout Plant for Duct Relining Cavity Filling
WGP800 / 1200 / 200PI-D grout plant for duct relining cavity filling is a highly efficient grout plant developed by Wodetec grouting equipment factory for many years, WGP800 / 1200 / 200PI-D grout plant is a combination of mixer, pulper and grouting pump A set of equipment together to perform efficient and low-consumption work, effectively reduce complex procedures and remote operation. The mixer is a vortex mixer, which can ensure that the cement slurry is evenly and quickly mixed. The pulper performs high-speed pulp production and storage of cement slurry and similar materials, and then directly pumps the slurry to the construction connection point Complete uninterrupted pulping and grouting.
For WGP800 / 1200 / 200PI-D grout plant for duct relining cavity filling, it has 800L high-shear high-speed grouting mixer volume, mixer volume is 1200L, grouting pressure is 0-50Bar, grouting flow rate is 0-200L / min, two Both can be adjusted steplessly. The power source is 55KW air-cooled diesel engine, using air-cooling technology, which is very suitable for on-site construction.
Advantages of WGP800 / 1200 / 200PI-D grout plant for duct relining cavity filling:
1. Compact structure, integrating a pulper, mixer and grouting pump in one
2. With low pressure, high pressure and stepless speed regulation system
3. Full hydraulic drive, diesel engine as power source
4. Simple operation and maintenance
5. Double-cylinder single-acting grouting pump to ensure continuous grouting and no kicking.
6. Quick and easy cleaning of the valve cavity;
7. The outlet of the grouting pump is equipped with a buffer. This can further reduce grouting pressure fluctuations.
8. Special tools are included to ensure quick piston replacement and reduce replacement time.
9. Fewer spare parts ensure lower maintenance cost
10. The agitator and agitator use stainless steel material.
WGP800 / 1200 / 200PI-D grout plant is mainly used for duct relining cavity filling, road, railway, hydropower, construction, mining and other above-ground and underground engineering construction, can quickly mix water, cement, sand, bentonite, filler, clay, silicon Salt and other media. Then the grouting / grouting is carried out by the plunger-type grouting pump station to achieve waterproof plugging, tunnel lining, reinforcement of foundations, rock layers, and filling of voids. This series of grouting pump station has compact structure, high grouting pressure and wide application range.
So do you want a grout plant for duct relining cavity filling with such high output? If you think WGP800 / 1200 / 200PI-D grout plant is not suitable for your project and cannot meet your needs, in order to recommend a suitable type and the most favorable price more quickly,
Please help us confirm the following:
-
Which project will use grout plant for dam grouting, tunnel grouting or other?
-
What is the maximum pressure you need? 50 bar, 100 bar or more?
-
What output do you need, the maximum flow is 200L, 150L, 100L or less?
-
Do you want grout plant with electric motor or diesel engine? If you need a grout plant with a motor, please also confirm the voltage on site. Is it three-phase, 380v, 50hz or other?
- Do you need a blender and blender made of stainless steel or other materials to save some costs?
Once the above problems are determined, we will recommend the appropriate model and product quotation for you in the shortest time, please feel free to contact us, our email: sales@wodetec.com